During a review of the phase-wise construction and handover plan, the Union Minister was informed that Phase-I buildings, including the OPD Registration Block, OPD Block, residential buildings and designated hostels, had been completed

पूरी ख़बर पढ़ें — The Hindu →

स्रोत: The Hindu